Valve Replacement
Replacement of valves at power generating plant.
Processing Equipment and Piping
Processing equipment and piping installation in a food processing plant.
Conveyor Installation
Conveyor installation for feed dryer project.
Feed Dryer Installation
Feed dryer installation, including rigging, setting, and all associated equipment, as well as alignment of rotating equipment. Shop fabrication and erection of structural steel. Shop fabrication and installation of all piping. Installation of electrical power wiring and controls.
Reinforced Concrete Tank
Large, rectangular, heavily-reinforced, concrete tank with shop fabricated catwalk, handrail, and stairs. Tank had multiple compartments with stainless aeration piping. Wastewater effluent processing equipment and piping, including electrical power wiring and controls.
Boiler Setting
Rigging and unloading boiler. For shipping clearances, boiler had to be shipped on its side. Boiler was lifted and rotated prior to moving and setting in final location.
Heat Exchanger and Tubing
Heat exchanger and stainless steel sanitary tubing in a food processing plant.
Boiler Unloading and Transport
Rigging and unloading boiler off railcar prior to loading on trailer to transport to location in an industrial plant.
Pumps and Tanks
Set and align multiple pumps. Move, rig, and set multiple tanks. Layout, detail, shop fabricate, and install stainless steel piping for a bulk storage terminal facility.
Fertilizer Warehouse
Demolition and reconstruction of a fertilizer storage facility.
Gas Boiler Installation
Installation and startup of gas boilers and all ancillary equipment.
Feed Dryer